INSTALLATION PROCEDURE 1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY (a) Install the switch to the manual valve shaft.
(g) Hold the switch in position and tighten the bolt. Torque: 13 N·m {130 kgf·cm, 9 ft·lbf}
(j) Connect the switch connector. 2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY ![]() (a) Connect the cable with the nut. Torque: 13 N·m {133 kgf·cm, 10 ft·lbf} NOTICE: When connecting the cable to the transmission control shaft lever, make sure the L bracket of the cable faces the inside of the vehicle. 3. ADJUST SHIFT LEVER POSITION (for Column Shift Type) 4. ADJUST SHIFT LEVER POSITION (for Floor Shift Type) 5. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY (a) Inspect the switch (See page |
Toyota Tundra Service Manual > Generator: Reassembly
REASSEMBLY PROCEDURE 1. REMOVE GENERATOR DRIVE END FRAME BEARING (a) Using SST and a press, press in a new bearing. SST: 09950-60010 09951-00470 SST: 09950-70010 09951-07100 (b) Install the retainer plate with the 4 screws. Torque: 2.3 N·m {23 kgf·cm, 20 in·lbf} 2. INSTALL GENERATOR ROTOR ASSEMBL ...