DATA LIST / ACTIVE TEST 1. ACTIVE TEST HINT: Using the Techstream to perform the Active Tests allows relays, VSVs and actuators and other items to be operated without removing any parts. This non-intrusive functional inspection can be very useful because intermittent operation may be discovered before parts or wiring is disturbed. Performing Active Tests early in troubleshooting is one way to save diagnostic time. Data List information can be displayed while performing Active Tests. (a) Connect the Techstream to the DLC3. (b) Turn the ignition switch ON. (c) Turn the Techstream on. (d) Enter the following menus: Body Electrical / Air Conditioner / Active Test. (e) According to the display on the Techstream, perform the "Active Test". Air Conditioner
|
Toyota Tundra Service Manual > Can Communication System: Check Bus 3 Line for Short to +B
DESCRIPTION There may be a short circuit between one of the CAN bus wires and +B when no resistance exists between terminal 6 (CA3H) of the central gateway ECU (network gateway ECU) and terminal 16 (BAT) of the DLC3, or terminal 21 (CA3L) of the central gateway ECU (network gateway ECU) and terminal ...