INSTALLATION PROCEDURE 1. INSTALL STEREO COMPONENT TUNER ASSEMBLY (w/ Satellite Radio) 2. INSTALL NO. 2 RADIO RECEIVER BRACKET (a) w/o Satellite Radio: Install the No. 2 radio receiver bracket with the 3 bolts. Torque: 3.5 N·m {36 kgf·cm, 31 in·lbf} (b) w/ Satellite Radio: Install the No. 2 radio receiver bracket with the 5 bolts. Torque: 3.5 N·m {36 kgf·cm, 31 in·lbf} 3. INSTALL NO. 1 RADIO RECEIVER BRACKET (a) w/o Satellite Radio: Install the No. 1 radio receiver bracket with the 3 bolts. Torque: 3.5 N·m {36 kgf·cm, 31 in·lbf} (b) w/ Satellite Radio: Install the No. 1 radio receiver bracket with the 5 bolts. Torque: 3.5 N·m {36 kgf·cm, 31 in·lbf} 4. INSTALL NO. 1 NAVIGATION WIRE (w/ Satellite Radio) 5. INSTALL NAVIGATION RECEIVER ASSEMBLY (a) Connect each connector. (b) Insert the navigation receiver assembly with bracket and attach the 2 guides and 3 clips on its backside. NOTICE: When inserting the navigation receiver, do not press its knobs. (c) Install the navigation receiver assembly with bracket with the 4 bolts. Torque: 5.5 N·m {56 kgf·cm, 49 in·lbf} 6. INSTALL AIR CONDITIONING CONTROL ASSEMBLY 7. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY 8. INSTALL REAR UPPER CONSOLE PANEL SUB-ASSEMBLY 9. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY 10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page
|
Toyota Tundra Service Manual > Front Evaporator Temperature Sensor: Inspection
INSPECTION PROCEDURE 1. INSPECT NO. 1 COOLER THERMISTOR (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition 1 - 2 -10°C (14°F) 7.30 to 9.10 kΩ -5°C (23°F) 5.65 to 6.95 kΩ 0°C (32°F) 4.40 to 5.35 kΩ 5° ...