INSTALLATION PROCEDURE 1. INSTALL CANISTER PUMP MODULE
2. INSTALL CHARCOAL CANISTER ASSEMBLY (a) Install the charcoal canister assembly with the 4 bolts. Torque: 29 N·m {296 kgf·cm, 21 ft·lbf} (b) Attach the wire harness clamp. ![]() (c) Connect the vent line hose. (1) Push the vent line hose into the port and push the retainer to lock it. Text in Illustration
NOTICE:
(d) Connect the air inlet line hose. NOTICE:
(e) Connect the purge line hose and slide the clamp to secure the hose. (f) Connect the canister pump module connector. (g) Connect the wiring harness clamp bracket with the nut. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} |
Toyota Tundra Service Manual > 1ur-fe Emission Control: Pcv Valve
ComponentsCOMPONENTS ILLUSTRATION InspectionINSPECTION PROCEDURE 1. INSPECT PCV VALVE SUB-ASSEMBLY (a) Install a clean hose to the PCV valve sub-assembly. (b) Check the PCV valve sub-assembly operation. (1) Blow air into the cylinder head side, and check that air passes through easily. CAUTION: Do ...