Toyota Tundra Service Manual > Transmission Control Cable(for Column Shift Type): Installation
INSTALLATION PROCEDURE 1. INSTALL COLUMN SHIFT TRANSMISSION CONTROL CABLE ASSEMBLY (a) Insert the transmission control cable from the vehicle interior, and install the cable retainer with the 2 bolts. Torque: 5.5 N·m {56 kgf·cm, 49 in·lbf} (b) Connect the cable to the steering column shaft bracke ...